ds512az
All Star
- Joined
- Jun 26, 2002
- Posts
- 573
- Reaction score
- 0
Alot of little work going on. Cupholders, tinting floors, polishing, etc. They were putting down the metal plates that tray will ride on so the test should be soon. Got to watch Cards highlights on the big screen. Part zone is getting pretty far along, (it looks small in the pic, but the kitchen area for both sides are behind the counters, out of sight). Grass is definitely getting green. Lots of little signage going up. Hope fully soon, they will start work on the wall of fans.Seems like they are putting removable seats where the tunnel entry way are.
Last edited: